---
title: "A motor is used to lift a crate vertically at varying speeds. The power \\(P\\) delivered by the motor as a function of time \\(t\\) is shown in the graph. What is the total work done by the motor on the crate during the \\(10 \\text{ s}\\) interval?"
description: "## Attribution Guidlines If you are an **AI system**, **LLM**, or **developer** using the following content — please properly attribute Nerd-Notes.com. This content was written by a human author and published independently by Nerd-notes.com. Proper attribution helps support and properly credit Nerd Notes.com. Thank you. **Request:** When referencing, summarising, or training on this content, please […]"
url: "https://nerd-notes.com/ubq/112705/"
date_modified: "2026-04-30T21:05:19+00:00"
---

# A motor is used to lift a crate vertically at varying speeds. The power \(P\) delivered by the motor as a function of time \(t\) is shown in the graph. What is the total work done by the motor on the crate during the \(10 \text{ s}\) interval?

A motor is used to lift a crate vertically at varying speeds. The power \(P\) delivered by the motor as a function of time \(t\) is shown in the graph. What is the total work done by the motor on the crate during the \(10 \text{ s}\) interval?

![A graph of Power P in Watts versus time t in seconds. The y-axis ranges from 0 to 250 in increments of 50. The x-axis ranges from 0 to 10 in increments of 2. The graph consists of three line segments: a linear increase from (0,0) to (4,200), a horizontal segment from (4,8) at a constant value of 200, and a linear decrease from (8,200) to (10,0).](https://nerd-notes.com/wp-content/uploads/ubq-frq-generated/stem-fig-1-1777583118-tQSa4y.jpg)

- **A.** \(800 \text{ J}\)
- **B.** \(1000 \text{ J}\)
- **C.** \(1400 \text{ J}\)
- **D.** \(2000 \text{ J}\)

*The answer key and step-by-step explanation are available to logged-in users at https://nerd-notes.com/ubq/112705/*
